The project consists of an extension to the existing secondary school building and will incorporate 12 classrooms, two science laboratories, technology room, language laboratory, an IT suite; a music and drama suite, a lecture hall and gymnasium and fitness suite. The new three storey stand-alone extension will have a gross internal floor area of over 3,500m2. The existing school remained live during the construction.